Jnana Therapeutics moved into their new home on the 3rd floor of 6 Tide Street in the Seaport District. The 15,000 sf office and lab fit out features over 7,000 sf of biology and chemistry lab space as well as open office seating, multiple private meeting areas, and a...
PIDC received final sign off on the first of three lab/office projects to be completed at 480 Arsenal Way in Watertown. ALS Therapy Development Institute (ALS TDI) will move into a newly upgraded 12,000 sf suite completed in mid-February. PIDC is underway with two...
After converting over 76,000 sf at 10 Wilson Road in Cambridge to support lab occupancy, PIDC completed the 22,000 sf office/lab fit out for new tenant Civetta Therapeutics. Occupying the full third floor, Civetta’s new space features over 10,000 sf of lab...
PIDC reached substantial completion on the conversation of 65 Grove Street in Watertown, MA to support lab tenant occupancy. Owned by BioMed Realty, the existing 120,000 sf facility was modified to include a new penthouse, roof top units, lab exhaust, stand-by...
As the completion of the LINX building approached, PIDC was engaged by Bolyston Properties to construct all lab ready infrastructure to support the conversion of 110,000 sf of rental space to lab.office use at Arsenal Yards. This included to large equipment wells cut...
PIDC recently installed a 2-module pre-packaged central heating and cooling plant for 10 Wilson Road at The Quad in Cambridge, MA. The system includes 3,750 MBH of condensing hot-water boilers and associated ancillary systems – plus hot-water/chilled-water pumps and...