PIDC recently installed a 2-module pre-packaged central heating and cooling plant for 10 Wilson Road at The Quad in Cambridge, MA. The system includes 3,750 MBH of condensing hot-water boilers and associated ancillary systems – plus hot-water/chilled-water pumps and...
In the fall of 2016, PIDC Construction began an HVAC controls and infrastructure upgrades project at the Whitehead Institute for Biomedical Research — a world leader in biomedical research and education. Located at 455 Main Street, Cambridge, MA, the seven-story...
PIDC provided design/build and construction management services for the conversion of the 185,000 sf LINX building located in Watertown, MA from office use to lab use. The LINX building needed a full range MEP/FP Lab ready infrastructure with 153,000cfm of makeup air,...
PIDC Construction, LLC (PIDC) would like to announce the successful “Substantial Completion” of the MATEP Third Turbine Project. The project began in January 2016, with full construction release in August 2016 and was substantially completed by April 2017. As...